Bungalow

Job completed July 2011.

Work that was done:

  • 6″ continuous eavestrough around the whole house.
  • Downspouts, both standard and “flip up”.
  • Fascia and soffit already done prior to our arrival.

During the two working days that we were on-site we removed and replaced over 600 ft of eavestrough and downspouts.  The old material was recycled, where appropriate, and the new eavestroughs were installed and slope-tested to ensure proper drainage.